Installation of wooden structures


Installation of wooden structures is divided into separate stages, consisting of preparatory work, assembly and installation of structures in the design position.

Preparatory work, the accuracy of the dimensions of the openings in which the structures are installed; strength and durability of installed wooden structures; consists of checking the working condition of the tool and lifting, footing, alarm mechanisms.

Prior to installation, wooden structures are carefully calibrated, as well as checked for certain measures to protect them from moisture and fungal attack.

Wooden structures are installed in accordance with pre-approved flow schemes.

Mounting equipment - cranes, winches, blocks, hoists and various mounting devices - slings, traps, handles are used for the installation of wooden structures. These machines and devices are also used for loading and unloading operations.